Solar Power System


Solar Power System
LuxcoLuxco > Business > Solar Power System

Continuous business innovation and R&D to contribute to the development of
national Industry

Continuous management innovation for systematic R&D based on drastic investment can contribute to industrial
development through regional and national companies in a variety of efforts and attempts to become.

Solar Power System

 

Development business structure

 
 

Development profit structure

 

[ The way of Revenue output ]

  • Power output(kW)= Facilities Capacity(kW) X Power generation time(about 3.5h) X 365 day
  • Unit price= SMP + REC X Weights
    +SMP(System Marginal Price): System marginal price
    (Monthly KPX announcement)
    +REC(Renewable Energy Certificate): Renewable Supply Certificate
    +REC Weights: Weights on buildings and existing facilities utilization projects
 

[ REC Weights ]

REC Weights Installation Type Detailed criteria
1.2 When installed on a regular site Under 100kW
1.0 From 100kW
0.7 From beyond 3,000kW
1.5 When using existing facilities such as buildings Below 3,000kW
1.0 From beyond 3,000kW
1.5 When installing floated on the surface of the retainer

The above REC weighting will be implemented from March 13, 2015

 

 

Please check the menu on the left for Our Performance

[Click]
 

[ Electric Construction Association Registration Status ]

Performance Year Project Name Installed Capacity (kW)
2017 Taein Mareung #1, #2 Photovoltaic Power Plant 595.82
Gwanglim #1, #2 Photovoltaic Power Plant / Oseung Photovoltaic Power Plant 293.76
Ulsan City Library Photovoltaic Power Plant 92.16
Wolsan, Dalmoe Photovoltaic Power Plant 297.6
Huiseung Photovoltaic Power Plant 348.16
Green Villeage(Samho-dong, Ulsan) 508.56
Housing support project 414
Love Sunlight Energy Business 46.32
Building support business 124.5
2016 Building support business 10
Building support business 7
Hansan Agricultural Cooperative Solar Power Plant 49.5
2015 NO.1 FCC Revamp Proect 51
IKJUN A Solar Power Plant System 19.5
Hongik Industrial Power Plant 99
2014 Taewon Solar Power Plant 864
KPIC EOG Project / Solar Power Generation Equipment 80
Hansung Solar No. 1 Solar Power Plant 99
Hansung Solar 2nd Solar Power Plant 350
No.2 FCC Revamp Project 70
2013 Bok Solar power generation plant (72.0kWp) Power generation solar power generation facility construction 72
Sunshine Sharing Hope Electricity Solar Install (Charsarang Solar Power Plant) 15
Sunshine Sharing Hope Electricity Solar Install (Gaon Solar Power Plant) 10
Total 4516.88

  • [Ulsan Factory] 24 Hwalbam-ro, Buk-gu, Ulsan (814 Hyomun-dong)TEL +82-52-280-0800 FAX +82-52-287-8598
  • [Busan Factory] 3F, 122 Mieumsandan 3-ro (Mieum-dong), Gangseo-gu, Busan TEL +82-51-260-1300 FAX +82-51-260-1399
  • [Busan Technology Research Center] 2F, 122 Mieumsandan 3-ro (Mieum-dong), Gangseo-gu, Busan TEL +82-52-260-1300 FAX +82-51-260-1399
  • [Eonyang Factory] 58, Galjeon-gil, Eonyang-eup, Ulju-gun, Ulsan (663-42 Pyeong-ri)TEL +82-52-280-0700 FAX +82-54-556-8581