Energy Storage System
- Solar Power Plant Connection ESS 100kW ~ 1MW : 2~4 hours Charge/Discharge
- Building Peak Reduction ESS 50kW ~ 1MW : 2~6 hours Charge/Discharge
Luxco ESS equipment is installed in the building directly, or in the sandwich panel, or in the container made to fit the equipment, according to customer's requirements. PCS, Transformer, Battery Rack, Switchboard, PMS, Air-conditioning, and Heating equipment, Air-conditioning system, and Additional Facilities, etc are designed and manufactured to meet the capacity and the specification.